question archive Project Description • You are the new project / quality manager at Health Clinic Quality Improvement Experts LLC

Project Description • You are the new project / quality manager at Health Clinic Quality Improvement Experts LLC

Subject:ManagementPrice: Bought3

Project Description • You are the new project / quality manager at Health Clinic

Quality Improvement Experts LLC.

• This is your first clinic project assignment at the company.

• The clinic has five teams performing colonoscopies. Each

team consist of an:

• Admittance Expert

• Triage/Preparation Nurse

• Anesthesiologist

• Procedure Nurse

• Proctologist

• Post Procedure Nurse Specialist

• Closure Nurse

 

 

Project Description

• The clinic has the ability and facilities to run

five lines of work at any one point in time and a

separate patient arrival area / waiting room.

• The clinic has some concerns as to its

business and increasing revenue as well as the

quality of its services.

 

 

Project Objectives

Overall objective:

Is to increase the patient turn-around per day while

at the same time increasing the patient customer

satisfaction results, increasing clientele and

decreasing medical errors.

 

 

Project Objectives

Our Corporate / Six Sigma Project objectives:

1. Reduce the number of colonoscopy process errors

system wide.

2. Improve documentation of colonoscopy administration.

3. Reduce waste in product and time in colonoscopy

administration.

4. Improve patient satisfaction with their colonoscopy

experience.

5. Improve bed flow for patients receiving a colonoscopy.

 

 

Project Objectives

Instructions:

• In order to complete the needed objectives, we will apply a Six Sigma full

DMAIC process (Define, Measure, Analyze, Improve and Control).

• Please see the documents to be created for the project (next slide).

• As a team, it is extremely important to all of you that you participate in

the creation of every document listed below in some way.

• That you leave this course with the knowledge of what that document is

for and what it typically contains.

• You will need to create all of the documents as a team, and you will use

those documents to create slides for your project status presentation

Sunday morning using PowerPoint.

• You will have 21 slides (PPT) and related notes and documents (Word

doc).

 

 

21- Slide PowerPoint

1. Cover Slide

2. Project Charter

3. Statement of Work (SOW)

4. Scope Document

5. Complete Risk Identification

6. Create a Risk Matrix

7. Create a Risk Remediation Plan

8. Define the Problem by Developing a “Problem Statement”

9. Define the Goal by Developing a “Goal Statement”

10. Define the Process by Developing Process Maps

11. Measure - Determine What Variables We Will Study

12. Measure - Create a Plan to Collect the Data

13. Analyze - Look for What Might be Causing the Problem

14. Analyze - Verify the Cause(s) of the Problem

15. Improve - Brainstorm Solutions That Might Fix the Problem and Select the Practical Solutions

16. Improve - Develop Maps of Processes Based on Different Solutions

17. Improve - Select the Best Solution(s)

18. Control - Design Measures to Ensure Improvement

19. Document the Improved Process

20. Continuously Improve the Process Using Lean Principles

21. Closing Thoughts