a)The desired daily output for an assembly line is 360 units. This
assembly line will operate 450 minutes per day. The following table contains this product's task times and precedence relationships:-
TASK ,TASK TIME (Seconds), IMMEDIATE PREDECESSOR
A 30 -----
B 35 A
C 30 A
D 35 B
E 15 C
F 65 C
G 40 E,F
H 25 D,G
i)Draw the precedence diagram and calculate the workstation cycle time. ii)Balance this line using a) Longest task time rule, b) Largest number of follower rule. iii)Calculate the efficiency of the line. iv) If the desired output changes to 375 units. What would you do?
b. What are the various selective Inventory control techniques? Perform ABC Analysis on the given set of items and identify the A,B,C class items. ITEMS ,UNITS,UNIT PRICE (AED)
A 70 25
B 240 15
C 15 50
D 6 110
E 380 8
F 400 3
G 600 1
H 30 18