question archive The City of Springfield Flood Control District has a flood control project will require either replacement of a large, galvanized culvert or the construction of a concrete canal

The City of Springfield Flood Control District has a flood control project will require either replacement of a large, galvanized culvert or the construction of a concrete canal

Subject:EconomicsPrice:2.87 Bought7

The City of Springfield Flood Control District has a flood control project will require either replacement of a large, galvanized culvert or the construction of a concrete canal. The cost of the canal, which will last indefinitely, is $7,500,000. Maintenance costs are $4,000 per year. A culvert, which will have to be replaced every 30 years, will cost $4,000,000 and has an annual maintenance cost of $7,000. Salvage values are roughly $0 and the interest rate is 5%. Which alternative has the lower equivalent annual cost?

Option 1

Low Cost Option
Download this past answer in few clicks

2.87 USD

PURCHASE SOLUTION

Option 2

Custom new solution created by our subject matter experts

GET A QUOTE

rated 5 stars

Purchased 7 times

Completion Status 100%