question archive Which of the following is a reason the modified internal rate of return (MIRR) measure is a better indicator of a project's true profitability than the internal rate of return (IRR) measure A
Subject:BusinessPrice:2.87 Bought7
Which of the following is a reason the modified internal rate of return (MIRR) measure is a better indicator of a project's true profitability than the internal rate of return (IRR) measure
A. The modified internal rate of return (MIRR) assumes that the project's cash flows are reinvested at its internal rate of return (IRR), which is generally correct.
B. The modified internal rate of return (MIRR) assumes that the terminal value of the project is the profit it generates, which is generally correct.
C. The modified internal rate of return (MIRR) assumes that the project's cash flows are reinvested at the firm's required rate of return, which is a better assumption than the IRR assumption that the cash flows are reinvested at its IRR.
D. The modified internal rate of return assumes that the future value of the project's cash outflows is equal to its terminal value, which is always correct.
Purchased 7 times