question archive During the construction of a recent office building, your company’s framing crew installed 515 lineal feet of 8-foot-high, metal-stud wall in two days
Subject:Civil EngineeringPrice:2.87 Bought7
During the construction of a recent office building, your company’s framing crew installed 515 lineal feet of 8-foot-high, metal-stud wall in two days. The crew consisted of two carpenters and one helper and worked eight hours per day. Determine productivity rate in labor hours per foot of wall for installing metal-stud walls on this project.
Select one:
a. 0.093 lhr/lft
b. 0.084 lhr/lft
c. 0.102 lhr/lft
d. None of the above
Answer:
Option a is correct
please use this google drive link to download the answer file.
https://drive.google.com/file/d/1r1sE0QtD7xkmvWdexorhF6KvjCzoJyRz/view?usp=sharing
note: if you have any trouble in viewing/downloading the answer from the given link, please use this below guide to understand the whole process.
https://helpinhomework.org/blog/how-to-obtain-answer-through-google-drive-link