Project - 2

The journal indicated below describes a national project. Based on the journal, and on your team’s understanding of the project, answer the questions below:

DOI: 10.1061/(ASCE)CF.1943-5509.0000332  

Journal title: "1976 Montreal Olympics: Case Study of Project Management Failure"

#

Question

Points

1

Was it an internal or external project? Provide rationale.  

2.5

2

Identify at least 10 major stakeholders for the project.

2.5

3

What were the needs or expectation of each stakeholder?

2.5

4

Identify and describe at least 5 most important resources used in the project.

2.5

5

What was the alternative approach for the project (i.e. if the stadium had not been built, what else could have been done to ensure the olympics still occurred)?

2.5

6

Based on (5) above, was building the stadium at this location and at this time the best approach to have been chosen?  Provide rationale using PV, NPV, IRR, B/C. [1 page]

10

7

Provide two Level 3 Work Breakdown Structures (WBS) for this project. These two should be the intial (or planned) and final (or actual) WBS. Explain the difference  [2 pages]

5

8

Based on (7), was there an evidence of scope creep in the project? Provide rationale.

2.5

9

Create one network diagram for the project using the final WBS in (7) above [1 page]

15

10

Use the Level 2 tasks in the final WBS to create one GANTT chart for the project. [1 page]

15

11

Use the initial and final WBS to create two high-level budgets for the project. These two should be the initial and final budgets. Explain the difference. [2 pages]

15

12

Using the risk sources, describe three major (broad) categories of risks in the project.

3

13

Using a table, list at least ten individual risks ranked by severity, and also link each of them to one of the categories in (12) above [1 page]

15

14

For each risk in (13) above, describe at least one thing that was done, or could have been done to mitigate that risk.

2.5

15

Was there adequate quality management processes in place (including quality planning, quality assurance and quality control)? Provide rationale. 

2

16

Was there adequate outsourcing in the project? Provide rationale.

2.5

17

The journal title indicates this project was a failure. Do you agree? Provide rationale. 

2.5

18

If anyone in your group was appointed the project manager for this project, what would you have done differently to make this project successful?

2.5

19

Describe at least five major lessons that can be learned from this project.

2.5

20

Other – Abstract, Introduction, Conclusion (one paragraph each)

5

21

Other – Effective APA (Times New Roman, font size 12, double-spaced, in-text citations, grammar, reference list, etc)

5

22

Other Considerations

2.5

 

TOTAL

120

            Side note from instructor:

1. Your response should be between 15 -20 pages only, including all auxilliary pages such as Title page, Reference page and Table of Content.

2. This research project requires you to tie together the key components of project management.

3. Ensure all responses you provide (including numbers and facts) are supported with information from the journal, or where necessary, provide appropriate assumptions and additional information from external sources. However facts from the journal will trump all external sources. This journal including all other external sources should be correctly referenced.

4. Use effective APA in-text citation to help the reader know exactly where you are picking your facts from. 

5. Your groups should help you bounce off ideas off each other, since no one person knows it all. 

6. If there are any questions or clarifications needed, the PM may contact me. All the best!

 

Check the journal project and please work on 7-11 questions total 5 questions, charts and graphs add content and follow instructions

Project

 

-

 

2

 

The

 

journal

 

indicated

 

below

 

describes

 

a

 

national

 

project.

 

Based

 

on

 

the

 

journal,

 

and

 

on

 

your

 

team’s

 

understanding

 

of

 

the

 

project,

 

answer

 

the

 

questions

 

below:

 

DOI:

 

10.1061/(ASCE)CF.1943

-

5509.0000332

 

 

Journal

 

title:

 

"1976

 

Montreal

 

Olympics:

 

Case

 

Study

 

of

 

Pro

ject

 

Management

 

Failure"

 

#

 

Question

 

Points

 

1

 

Was

 

it

 

an

 

internal

 

or

 

external

 

project?

 

Provide

 

rationale.

 

 

2.5

 

2

 

Identify

 

at

 

least

 

10

 

major

 

stakeholders

 

for

 

the

 

project.

 

2.5

 

3

 

What

 

were

 

the

 

needs

 

or

 

expectation

 

of

 

each

 

stakeholder?

 

2.5

 

4

 

Identify

 

and

 

describe

 

at

 

least

 

5

 

most

 

important

 

resources

 

used

 

in

 

the

 

project.

 

2.5

 

5

 

What

 

was

 

the

 

alternative

 

approach

 

for

 

the

 

project

 

(i.e.

 

if

 

the

 

stadium

 

had

 

not

 

been

 

built,

 

what

 

else

 

could

 

have

 

been

 

done

 

to

 

ensure

 

the

 

olympics

 

still

 

occurred)?

 

2.5

 

6

 

B

ased

 

on

 

(5)

 

above,

 

was

 

building

 

the

 

stadium

 

at

 

this

 

location

 

and

 

at

 

this

 

time

 

the

 

best

 

approach

 

to

 

have

 

been

 

chosen?

 

Provide

 

rationale

 

using

 

PV,

 

NPV,

 

IRR,

 

B/C.

 

[1

 

page]

 

10

 

7

 

Provide

 

two

 

Level

 

3

 

Work

 

Breakdown

 

Structures

 

(WBS)

 

for

 

this

 

project.

 

These

 

two

 

should

 

be

 

the

 

intial

 

(or

 

planned)

 

and

 

final

 

(or

 

actual)

 

WBS.

 

Explain

 

the

 

difference

 

 

[2

 

pages]

 

5

 

8

 

Based

 

on

 

(7),

 

was

 

there

 

an

 

evidence

 

of

 

scope

 

creep

 

in

 

the

 

project?

 

Provide

 

rationale.

 

2.5

 

9

 

Create

 

one

 

network

 

diagram

 

for

 

the

 

project

 

using

 

the

 

final

 

WBS

 

in

 

(7)

 

above

 

[1

 

page]

 

15

 

10

 

Use

 

the

 

Level

 

2

 

tasks

 

in

 

the

 

final

 

WBS

 

to

 

create

 

one

 

GANTT

 

chart

 

for

 

the

 

project.

 

[1

 

page]

 

15

 

11

 

Use

 

the

 

initial

 

and

 

final

 

WBS

 

to

 

create

 

two

 

high

-

level

 

budgets

 

for

 

the

 

project.

 

These

 

two

 

should

 

be

 

the

 

initial

 

and

 

final

 

budgets.

 

Explain

 

the

 

difference.

 

[2

 

pages]

 

15

 

12

 

Using

 

the

 

risk

 

sources,

 

describe

 

three

 

major

 

(broad)

 

categories

 

of

 

risks

 

in

 

the

 

proj

ect.

 

3

 

13

 

Using

 

a

 

table,

 

list

 

at

 

least

 

ten

 

individual

 

risks

 

ranked

 

by

 

severity,

 

and

 

also

 

link

 

each

 

of

 

them

 

to

 

one

 

of

 

the

 

categories

 

in

 

(12)

 

above

 

[1

 

page]

 

15

 

14

 

For

 

each

 

risk

 

in

 

(13)

 

above,

 

describe

 

at

 

least

 

one

 

thing

 

that

 

was

 

done,

 

or

 

could

 

have

 

been

 

do

ne

 

to

 

mitigate

 

that

 

risk.

 

2.5

 

15

 

Was

 

there

 

adequate

 

quality

 

management

 

processes

 

in

 

place

 

(including

 

quality

 

planning,

 

quality

 

assurance

 

and

 

quality

 

control)?

 

Provide

 

rationale.

 

 

2

 

Project - 2

The journal indicated below describes a national project. Based on the journal, and on

your team’s understanding of the project, answer the questions below:

DOI: 10.1061/(ASCE)CF.1943-5509.0000332

Journal title: "1976 Montreal Olympics: Case Study of Project Management Failure"

# Question Points

1 Was it an internal or external project? Provide rationale. 2.5

2 Identify at least 10 major stakeholders for the project. 2.5

3 What were the needs or expectation of each stakeholder? 2.5

4 Identify and describe at least 5 most important resources used in the project. 2.5

5

What was the alternative approach for the project (i.e. if the stadium had not been

built, what else could have been done to ensure the olympics still occurred)?

2.5

6

Based on (5) above, was building the stadium at this location and at this time the

best approach to have been chosen? Provide rationale using PV, NPV, IRR,

B/C. [1 page]

10

7

Provide two Level 3 Work Breakdown Structures (WBS) for this project. These

two should be the intial (or planned) and final (or actual) WBS. Explain the

difference [2 pages]

5

8

Based on (7), was there an evidence of scope creep in the project? Provide

rationale.

2.5

9

Create one network diagram for the project using the final WBS in (7) above [1

page]

15

10

Use the Level 2 tasks in the final WBS to create one GANTT chart for the

project. [1 page]

15

11

Use the initial and final WBS to create two high-level budgets for the project.

These two should be the initial and final budgets. Explain the difference. [2

pages]

15

12

Using the risk sources, describe three major (broad) categories of risks in the

project.

3

13

Using a table, list at least ten individual risks ranked by severity, and also link

each of them to one of the categories in (12) above [1 page]

15

14

For each risk in (13) above, describe at least one thing that was done, or could

have been done to mitigate that risk.

2.5

15

Was there adequate quality management processes in place (including quality

planning, quality assurance and quality control)? Provide rationale.