question archive If the completion fluid is sodium chloride brine and is to be used for a perforation operation, the reservoir depth is 10,000 ft

If the completion fluid is sodium chloride brine and is to be used for a perforation operation, the reservoir depth is 10,000 ft

Subject:BusinessPrice: Bought3

If the completion fluid is sodium chloride brine and is to be used for a perforation operation, the reservoir depth is 10,000 ft. The production casing is 6.625" OD and 5.921" ID, while the production tubing is 2.875" OD with 2.195" ID, the production packer is at a depth of 9800 ft. Assume the price of the fluid is 20.0 $/bbl and its renting rate...