question archive 38 pts 3 ) THIS SHAFT TRANSMITS A TORQUE 740 N OF 67500 NMM DETERMINE THE REQUIRED SHAFT D DIAMETER , BASED ON THESE FC

38 pts 3 ) THIS SHAFT TRANSMITS A TORQUE 740 N OF 67500 NMM DETERMINE THE REQUIRED SHAFT D DIAMETER , BASED ON THESE FC

Subject:Mechanical EngineeringPrice: Bought3

38 pts 3 ) THIS SHAFT TRANSMITS A TORQUE 740 N OF 67500 NMM DETERMINE THE REQUIRED SHAFT D DIAMETER , BASED ON THESE FC . PARAMETERS : KES = KF TORS = 2.9 S UT = 480 N / MM 2 KE = KF BEND = 2. 3 Sy= 360 N/ MM 2 B GOODMAN CRITERIA Sp = 178 N / MM Z A 1875 N n = 1.5 4 F X NO MORE THAN ONE ITERATION 15 REQUIRED 286 N At AB = 93 mm BC - 280 MM CD= 123 MM PULLEY B DIAM = 85 mm PULLEY C DIAM = 210 MM

 

 

pur-new-sol

Purchase A New Answer

Custom new solution created by our subject matter experts

GET A QUOTE