CM 4210 ( Construction Contracting )
The contractor chosen by the owner to enter into the contract was the low bidder. In reviewing its bid after the bid opening, the contractor realizes it has made six (6) mistakes. If the contractor corrects the first four mistakes, it will still be the low bidder. However, if it corrects a fifth or sixth mistake it will no longer be the low bidder. Is it ethical for the contractor to only correct four mistakes and still get the contract, or would ethics require correction of all six mistakes?