question archive CM 4210 ( Construction Contracting ) The contractor chosen by the owner to enter into the contract was the low bidder

CM 4210 ( Construction Contracting ) The contractor chosen by the owner to enter into the contract was the low bidder

Subject:ManagementPrice:2.84 Bought6

CM 4210 ( Construction Contracting )

The contractor chosen by the owner to enter into the contract was the low bidder. In reviewing its bid after the bid opening, the contractor realizes it has made six (6) mistakes. If the contractor corrects the first four mistakes, it will still be the low bidder. However, if it corrects a fifth or sixth mistake it will no longer be the low bidder. Is it ethical for the contractor to only correct four mistakes and still get the contract, or would ethics require correction of all six mistakes?

Option 1

Low Cost Option
Download this past answer in few clicks

2.84 USD

PURCHASE SOLUTION

Option 2

Custom new solution created by our subject matter experts

GET A QUOTE

rated 5 stars

Purchased 6 times

Completion Status 100%